OUTDOOR STAGE HIRE


MILOS MR1T

10x8m self climbing stage roof for hire

“The Milos MR1T structure is ideal for festivals and outdoor events. The quick build time, simple design and rock solid stability of this temporary roof make it the right choice for medium to large events.”

Specification

  • Outer Structure Dimensions - 12.8m x 8.5m

  • Stage Platform Dimensions - 10m x 7.5m (32’x24’)

  • Maximum Height - 5.90m

  • Maximum Internal Height 5.60m

  • Stage Height - 900 / 1200mm

  • Max Load Bearing Capacity - 1260kg UDL

  • Max Wind Speed - Up to 45mph (Advised evacuation speed lower)

  • Walls - Solid Blackout Walls with doorways

  • Ballast Required up to 6000kg - see options below

  • Estimated Build Time 8hrs

site/ event Requirements

  • Level site, 12.8M x 8.5M

  • Suitable Vehicle Access - Varying dependant on job/ site requirements

  • Access to Forklift/ Telehandler for Unloading/ Loading

  • Crew welfare facilities

Staging System

  • 32’x24’ Stage built from Litedeck 8’x4’ Sheets

    • Other configurations available

    • Other components/ sheet sizes/ riser package available

    • Handrail installed around 3 sides of staging

  • Treads/ Ramps available and to be specified on a job-by-job basis

Ballast

  • Costed based on the use of 1200mm Spirafix Ground Anchors into soil

  • Options for concrete and water ballast also available

FULL PRODUCTION

  • Other packages can be easily added to allow us to create a Full Production Package -

    • Lighting

    • Audio

    • Video

    • Special Effects

  • Contact one of our project managers to discuss the many oppurtunities and options available

Crew

  • Typically we build with a minimum of 6 crew

  • Crew numbers will vary dependant on location, job specific requirements, timeframe, site requirements

  • Dependant on location, travel and bed-nights will be chargeable

WEATHER

  • An anemometer will be installed on the structure to monitor wind speed

  • Forecasts monitored throughout the duration of the hire

  • Bad weather management plan in place, left clearly displayed around the structure